Clip-On Current Transfomer Johor Bahru (JB), Malaysia, Selangor, Kuala Lumpur (KL), Penang, India

Clip-On Current Transformer and Split Core CT for Power Metering
Retrofit CTs for Power Metering

Clip-On Current Transformers for Retrofit Power Metering

Saturn Pyro supplies clip-on current transformers and split-core CTs for power meters, energy monitoring, sub-metering and retrofit electrical measurement applications.

Clip-on current transformers are ideal when current measurement is required without disconnecting existing cables or modifying the main electrical circuit. They are commonly used in LV panels, distribution boards, MCC panels, switchboards, machines, chillers, compressors, pumps and production equipment.

Our split-core CT range supports practical retrofit installation for digital power meters, smart energy meters, multi-circuit meters, EMS, BMS, SCADA and IoTWatt 4.0. Selected models are available in Class 0.5 and Class 1 accuracy, making them suitable for energy visibility, sub-metering and measurement improvement projects.

Retrofit Metering

Add current measurement to existing panels without removing the cable, helping reduce installation work and shutdown requirements.

Sub-Metering and Load Profiling

Use clip-on CTs for feeder, tenant, equipment, production line and department-level energy monitoring.

IoTWatt 4.0 Integration

Pair split-core CTs with compatible power meters and gateways for dashboards, demand tracking, energy audits and EECA reporting support.

Typical applications: retrofit sub-metering, energy monitoring, power meter installation, load profiling, equipment-level measurement, tenant metering, demand tracking, EECA reporting, IoTWatt 4.0 deployment and industrial IoT integration.

  • Clip-on CTs
  • Split-core CTs
  • 5A / 1A secondary
  • Class 0.5 / Class 1
  • Power meter installation
  • Sub-metering
  • Load profiling
  • Demand monitoring
  • EMS / BMS / SCADA
  • IoTWatt 4.0 ready
  • Digital Energy Audit
  • EECA reporting support

Safety note: CT installation should be carried out by competent electrical personnel. For 5A / 1A CTs, the CT secondary circuit should not be left open while current is flowing in the primary conductor.

Whether the requirement is to add metering to an existing electrical panel or deploy a complete energy monitoring system, Saturn Pyro can help select the right clip-on CT size, accuracy class and metering configuration for a safe and reliable installation.

Contact Us Speak to us about CT selection, power meter installation, sub-metering or IoTWatt 4.0 integration.
1/1